Al Marjan Island: What the Masterplan Allows

Al Marjan Island, off Ras Al Khaimah (RAK), is four artificial islands on 2.7 square kilometres of reclaimed land. The operator publishes a programme of over 18,000 homes and more than 8,500 hotel keys, but not plot ratios, heights or a land-use map by island. This note separates what the plan states, what the regulator controls and what the sources show as built.

Victaura Research · · 16 min read

Illustration of shallow turquoise water over sand banks seen from above, divided into geometric zones by long lines of white marker buoys, a small boat crossing one of themIllustration

Key takeaways

  • - Al Marjan Island is four artificial islands on 2.7 km² of reclaimed land, with 23 km of waterfront and 7.8 km of beaches (broker-reported, Marjan masterplan page, read 14 November 2026).
  • - The published programme is 18,650 residential units, more than 8,500 hotel keys, 450 holiday villas and one integrated resort of 1,530 keys (broker-reported, Marjan).
  • - Marjan's page names no individual island and gives no heights, plot ratios or island-level allocation, so what each island admits cannot be established from public sources (not graded, gap in publication).
  • - The programme moved between dates, from 12,000 homes and 15,000 hotel keys in July 2024 to 18,650 homes and 8,500+ keys in 2026 (directional, Khaleej Times 16 July 2024 and Marjan).
  • - Development plots are described as sold out, so the diligence moves to the plot holder, the permit and the programme (broker-reported, Marjan page and Khaleej Times, 16 July 2024).
  • - Under Law No. 12 of 2023, the last text verified, off-plan sales in RAK ran through RERA-RAK registration, escrow approval and an Off Plan Sale Permit, with no marketing before the permit (Trowers summary, 21 November 2023).
  • - A reported Law No. 10 of 2026, issued 21 July 2026, repeals the 2023 law and abolishes the standalone committee (directional, Al Tamimi, 5 October 2026, and ADG Legal, 16 October 2026, issue date and repeal also listed by Lexis Middle East, official text not yet read).
  • - Wynn Al Marjan Island's tower has 70 floors and reached 283 m of structure in December 2025, with opening now forecast for September 2027 and the budget up by about $600 million (tower broker-reported, Gulf News; opening and budget from Khaleej Times, the budget increase directional, press-reported).
On this page (10)

What is Al Marjan Island and how large is it?

Al Marjan Island is a group of four coral-shaped artificial islands off Ras Al Khaimah (RAK), reclaimed from the Arabian Gulf and developed by Marjan, the emirate's master developer of freehold property. Marjan's own masterplan page gives 2.7 square kilometres of reclaimed land, 23 kilometres of waterfront and 7.8 kilometres of beaches (broker-reported, Marjan, page read 14 November 2026). These are the operator's figures, not a survey. They are the only totals the island publishes, and the press repeats them.

A masterplan, in this note, means the published allocation of land to uses, not the planning permission behind it. The allocation is public in outline. The permissions, plot ratios (the floor area allowed per unit of plot area) and height limits sit with the master developer and the regulator, and Marjan's page does not state them. The note keeps the two apart throughout, because what a plan says and what has been built are different grades of evidence.

The footprint is small, and that matters for underwriting. 2.7 square kilometres is 270 hectares. The programme the operator publishes for that land runs to 18,650 residential units and more than 8,500 hotel keys, plus an integrated resort. Density is the variable the principal has to price, and it is the number the island does not publish.

The entity behind the plan changed in October 2025. Marjan announced a merger with RAK Hospitality Holding, described in the release as the government-owned investment and development arm of the emirate, into one company operating under the Marjan name. The release does not state Marjan's own ownership. It ties the merged group to the RAK Vision 2030 goal of nearly 20,000 hotel keys in the emirate (directional, company release, undated on the Zawya copy and dated 23 October 2025 in a trade report of the release).

2.7 km²
Reclaimed land of Al Marjan Island, with 23 km of waterfront and 7.8 km of beaches. Broker-reported, operator's own figures, not an independent survey.

Source: Marjan, Al Marjan Island masterplan page, read 14 November 2026

Which islands exist, and what does each one admit?

The operator describes four islands and names none of them on its masterplan page. The page gives the programme for the archipelago as a whole. It does not assign residential, hotel or resort use to individual islands, and it does not publish a plot-level land-use map. Some secondary sources print names for the four islands. None was found on a primary page, so this note does not use them.

What can be sourced is where each use sits by project, not by island. Marjan's page lists the integrated resort, Wynn Al Marjan Island, and a set of hotels run by Rixos, Hilton, Radisson and Mövenpick. It lists Nobu Hotel & Residences and JW Marriott Ras Al Khaimah as under development. Residential towers appear by name without a status. Mapping any of them to an island needs the plot register, and the plot register is not public.

The programme is mixed-use by design. Hospitality, branded and unbranded residences, holiday villas and public space share the same land. The page lists promenades, cycling and running tracks, community parks and children's play zones as public and lifestyle space, with no area attached. The principal should not read the island as a residential district with hotels, or as a hotel district with homes. The published numbers support neither reading.

The land itself is allocated. Marjan's page states that development plots on Al Marjan Island are sold out, and its chief executive said the same to Khaleej Times on 16 July 2024 (press-reported). A sold-out masterplan changes the question. The principal is no longer asking what the plan allows on open land. The question becomes what each plot holder may build, on what timetable, and under whose approval.

What land uses does the Al Marjan Island masterplan allow?

The masterplan allows four published use types, hospitality, residential, holiday villas and an integrated resort, each with a planned quantity. On Marjan's page the hospitality pipeline is more than 8,500 hotel guestrooms. The residential programme is 18,650 planned units, written as "over 18,000" in the introduction. Holiday villas are 450. The integrated resort, Wynn Al Marjan Island, is 1,530 keys in the at-a-glance figures and "more than 1,500" in the text (all broker-reported).

Residential is the larger programme by unit count. 18,650 homes against 8,500 keys means roughly two homes for every hotel room. That ratio is Victaura's arithmetic on the operator's two figures, not a stated planning rule. It matters because branded residences are marketed on the strength of an adjoining hotel, and on the 2026 page the supply of residences is the bigger of the two, which was not the case in the July 2024 figures cited below.

The integrated resort is a use class of its own. Marjan's page describes it as a resort with retail, a convention facility, dining, entertainment and a gaming area. The sources read for this note do not say which authority licenses the gaming component or on what terms, and the note does not guess. The licence is a question an allocator should put to counsel, not infer from a marketing page.

Services are part of the plan. Marjan states that the island has district cooling and networks for power, water, sewage and telecoms. Utility capacity caps density in practice, and a published capacity figure per network would tell the principal more than a unit count does. The page gives none. Until one appears, the unit programme is a target, and utility capacity is a constraint the page does not quantify.

ItemPublished figureStatus in the sourceGrade and source
Reclaimed land2.7 km²Reclamation complete (island exists)Broker-reported, Marjan masterplan page, read 14 November 2026
Waterfront and beaches23 km; 7.8 kmNot stated in the sourceBroker-reported, Marjan masterplan page, read 14 November 2026
Hotel guestroom pipeline8,500+ keys (2026 page); 15,000 planned (CEO, July 2024)PlannedDirectional, the two counts differ and the definitions are not stated
Operating hotelsSix hotels, over 3,000 keys (July 2024)Operating at that dateDirectional, press-reported, Khaleej Times quoting Marjan's CEO, 16 July 2024
Residential units18,650 (2026 page); 12,000 planned (CEO, July 2024)Planned; status by project not statedDirectional, the two counts differ and the definitions are not stated
Holiday villas450PlannedBroker-reported, Marjan masterplan page, read 14 November 2026
Integrated resort1,530 keys; opening September 2027Under constructionBroker-reported, Marjan masterplan page (keys); Wynn Resorts via Khaleej Times, 5 August 2026 (opening)
Heights, plot ratios, densityNot published on the masterplan pageWynn tower only (70 floors, 283 m structure)Not graded, no masterplan limit is published; tower height is broker-reported, Gulf News, December 2025
Al Marjan Island: published programme, status and evidence grade

Who issues the permits on Al Marjan Island, and in what order?

For off-plan sales in RAK, the regulator is the Real Estate Regulatory Administration (RERA-RAK), which sits inside the Ras Al Khaimah Municipality Department. The Municipality's own page says the administration regulates the real estate sector, registers real estate development companies and monitors financial and technical projects to protect investors. Marjan is the master developer of the island. It is not the regulator of its own buyers' contracts, and that separation is the point of the chain.

The order, as the 2023 law set it, runs from the developer to the sale. First the developer registers in the Real Estate Development Register and proves its financial capacity. The Municipality page adds that RERA-RAK evaluates the applicant's cash flow. Second, each project is registered, and the page says the process applies to every project per plot. Third, the project escrow account is approved. Fourth, RERA issues an Off Plan Sale Permit, after approving the reservation forms and sale contracts.

Marketing comes last, not first. Under Law No. 12 of 2023, issued on 21 August 2023 according to its official copy, an off-plan project could not be advertised or marketed until the sale permit was held. The Municipality page says the same about written permission before advertising or promoting unit sales, exhibitions included. A launch event ahead of the permit would be a red flag the principal can test in one question (Trowers summary of the law, 21 November 2023).

Escrow is structured unit by unit. The Trowers summary of the law describes a main project account and a sub-account for each unit, with purchase receipts paid into the relevant sub-account and withdrawals for construction costs needing RERA approval. The trustee holds back five per cent of total construction cost for one year from the completion certificate, to cover defects. The escrow and payment-plan note follows the cash flow through that structure.

The masterplan allocates the uses. The register, the escrow account and the sale permit fix whether a given unit may be sold.

Victaura Research

Did Ras Al Khaimah change its development law in 2026?

According to two law-firm updates, the Ruler of Ras Al Khaimah issued a new real estate development law in July 2026, repealing Law No. 12 of 2023. Law No. 10 of 2026 was issued on 21 July 2026 and takes effect sixty days from issuance, around 19 September 2026 on Victaura's count, according to Al Tamimi & Company (5 October 2026) and ADG Legal (16 October 2026); its official text was not read. Al Tamimi & Company says the standalone project development committee is abolished and its functions pass to the Municipality Department and its Real Estate Regulatory Department, and ADG Legal describes the same consolidation (directional, law-firm commentary, not yet read against the official text; Lexis Middle East lists the same issue date and the repeal).

No official text of the 2026 law was read for this note, while the Municipality's site hosts the official copy of the 2023 law. That gap is the reason for the grade. A law firm's client update is a reliable pointer, but it is not the statute, and a principal who relies on a 2026 rule needs the signed copy. Until the official text is read, this note treats the 2026 changes as reported and the 2023 chain as the last text verified.

The reported changes are structural, not cosmetic. Al Tamimi says the new law builds a three-tier framework of main projects and sub-projects with main and sub-developer roles. Registration in the developer and project registers is still required before works or off-plan sales begin. A master-developed island with sub-developers is the kind of structure the main and sub-project tiers appear to describe.

A separate decree moved real estate disputes out of the special committee. Al Tamimi & Company reports, in a note of 10 September 2026, that Emiri Decree No. 11 of 2026, issued on 20 July 2026 and effective 1 September 2026, renames the committee as the committee for rental disputes and removes real estate disputes from its jurisdiction, so that they are heard by the ordinary RAK courts, with a first instance, an appeal and possibly cassation (directional, single source). How the change applies to a specific dispute is a question for counsel.

21 July 2026
Reported issue date of RAK Law No. 10 of 2026 on real estate development, repealing Law No. 12 of 2023. Directional, two law-firm sources for the content (Al Tamimi & Company, ADG Legal), issue date and repeal also listed by Lexis Middle East, official text not yet read.

Source: Al Tamimi & Company, Ras Al Khaimah's new real estate development law, 5 October 2026

What has been delivered on Al Marjan Island, and what is under construction?

On the dated sources, delivery is documented for hotels, not for homes. In July 2024 Marjan's chief executive named six operating hotels with over 3,000 room keys between them (directional, press-reported, Khaleej Times, 16 July 2024). Marjan's current page names Rixos, Hilton, Radisson and Mövenpick as operators on the island and lists Pullman and Rove in its navigation, without opening dates. The sources do not give a count of delivered residential units. That is a gap in the sources, not evidence that none exist, and the note does not estimate one.

Under construction is better documented for the resort than for anything else. Gulf News reported that Wynn Al Marjan Island's 70-floor tower topped out in December 2025 at 283 metres of structural concrete, with a spire still to be installed to reach 352 metres. Façade panels covered 79 per cent of the tower and the low-rise buildings were 99 per cent structurally complete at that date (broker-reported, Wynn via Gulf News). The topping out marked the shift to full interior fit-out across all 1,530 guest rooms and suites, with 1,504 already under way at that date.

The opening date moved. Wynn management said on 5 August 2026 that the resort will open to guests in September 2027, against a first-quarter 2027 target set earlier, and that the total project budget rose by about $600 million. Management attributed roughly half of the increase to disruption from the regional conflict (Khaleej Times and AGBrief, 5 August 2026; the budget increase is known only from the press and is directional). As of 14 November 2026, the opening is a company forecast, not an event.

Other named projects carry no status in the sources read. Marjan's page describes Nobu Hotel & Residences and JW Marriott Ras Al Khaimah as currently under development and gives no completion dates. On the branded side, the tier-one test for RAK branded supply sets out how to read an operator's name.

283 m / 352 m
Wynn Al Marjan Island tower, 70 floors. Structural height at topping out, December 2025, and full height once the spire is installed. Broker-reported, operator statement.

Source: Gulf News, Wynn Al Marjan Island tower tops out, December 2025

What does the Wynn site show about height and density on Al Marjan Island?

The Wynn tower is the only height the sources publish, and it is an outlier by design. Khaleej Times describes it as a 70-storey tower rising 352 metres (broker-reported, Khaleej Times, 3 May 2026). Marjan's page gives no height limit for the rest of the island. A principal should not read the resort tower as the island's skyline, and should not read the absence of a published limit as the absence of one.

The resort takes a large share of the land. Khaleej Times describes the Wynn site as more than 60 hectares on a purpose-built island. If that site sits inside the 2.7 square kilometres, which the sources read do not state outright, it occupies more than a fifth of the reclaimed land (Victaura arithmetic, 60 hectares against 270, directional). The remaining area carries the residential and hotel programme above, which tightens the density the rest of the island must absorb.

Density can be bracketed, but not measured. Dividing 18,650 homes and 8,500 hotel keys across the remaining 210 hectares or fewer gives a crude figure, and the note does not print it, because the programme counts are inconsistent across dates and the net developable area is unknown. A figure with that much slack would look like a measurement. It would not be one.

Where height limits are written, they are not on the page. The Municipality's development process and the master developer's design guidelines would carry them. The sources read for this note reach neither. For underwriting, that means a principal buying into a tower cannot yet check the height of the tower next door, which is the question that decides a sea view.

How do the published counts for Al Marjan Island disagree?

The residential programme moved from 12,000 to 18,650 units between July 2024 and November 2026 in the operator's own words. In 2024 Marjan's chief executive gave 12,000 planned residential units and 15,000 planned hotel keys. The 2026 page gives 18,650 units and more than 8,500 keys. The 2026 page is broker-reported, and the 2024 figures, known only from the press, are directional. Neither source explains the change, and a gap that size is a definition difference, a re-plan or a different perimeter.

The hotel figure fell while the residential figure rose. 15,000 keys became 8,500. A pipeline that shrinks by more than two-fifths in just over two years has either been re-scoped toward residences or counts different things, for instance keys on the island against keys across the Marjan group.

Emirate-wide hotel numbers add a second layer. CBRE's H1 2026 review, as reported, puts RAK at about 9,000 operational hotel keys across 60 hotels, with a further 8,500 keys planned for 2027 to 2030, almost two-thirds of the new supply on Al Marjan Island (industry estimate, CBRE, read through a Consultancy-me summary dated 22 September 2026). Counts differ by date and definition and should never be added together.

The principal should therefore quote the source and the date, never the number alone. A statement such as "18,650 planned units, Marjan, November 2026" can be checked and corrected. A statement such as "about 20,000 homes" cannot. The post-reset forecast note applies the same discipline to Wynn's timeline.

18,650 vs 12,000
Planned residential units on Al Marjan Island, per the operator's 2026 page against its chief executive in July 2024. Directional, definitions not stated.

Source: Marjan masterplan page, read 14 November 2026; Khaleej Times, 16 July 2024

A sold-out island does not close the diligence. It moves it from the land to the plot holder, the permit and the programme.

Victaura Research

Where is the evidence on Al Marjan Island thin, honestly disclosed?

The masterplan numbers all come from the operator. The 2.7 square kilometres, the 18,650 units and the 8,500 keys are published by Marjan about its own island. Under the Victaura grading they are broker-reported, useful and not independent. No registry extract, no survey and no audited quantity was found for any of them.

Heights, plot ratios and island-by-island allocation are not published. The note could not establish what any single island admits. That is the central finding on the brief, and it is stated as a gap rather than filled with a secondary source's island names or an estimate. A principal who needs those figures has to obtain them from the master developer or the Municipality.

The 2026 legal changes rest on two law-firm updates. Lexis Middle East lists its issue date and the repeal of the 2023 law, and the official text of Law No. 10 of 2026 was not read. The 2023 law is summarised from a law-firm page and the Municipality's description of the administration. Its official copy, listed in the references, was checked for the title and the issue date only. Quotation of any article of either law should wait for the signed text.

Opening dates and budgets are company forecasts. Wynn moved its opening once, and management tied part of the budget increase to regional conflict-related disruptions, while the Khaleej Times report of 5 August 2026 describes the regional war as continuing at that date. Later dated sources exist. Al Jazeera reported on 23 September 2026 that the United States and Iran held mediated talks after the collapse of the June memorandum of understanding, with the US blockade of Iranian ports still in place, and this site's re-read of Wynn's reset follows the record to 27 September 2026. As of 14 November 2026 this note has no source after those dates, so it carries no view on the conflict's course. Timelines for any unit on the island are forecasts, and the CBRE figures were read through a press summary, not the full report.

How should an allocator read the Al Marjan Island masterplan?

Read it as an allocation of use types with a published programme of quantities, which has moved between dates, and no published limit on form. The plan admits hospitality, residences, holiday villas and one integrated resort. It states a programme and leaves heights, density and island-level allocation to documents that are not public. That is a workable basis for a first screen and an incomplete basis for a decision.

Ask four questions of any unit on the island. Which plot is it on, and who holds the plot. Are the developer and the project registered with RERA-RAK, and is the escrow account approved. Has the Off Plan Sale Permit been issued before the marketing started. Which version of the development law governs the contract, the 2023 law or the 2026 law. Each question has a document behind it, and a seller who cannot produce the document has answered the question.

Price the neighbours, not only the unit. On a sold-out island the uncertainty is what gets built beside and above the buyer, in what order, and by whom. The resort's schedule has already moved once, and the residential status of most named projects is not stated. Principals comparing the island with other RAK locations should also read the freehold and Golden Visa note for the ownership side of the question.

The next datable events are verifiable. Wynn's September 2027 opening, the official text of Law No. 10 of 2026 and any update to Marjan's published programme would each change this note. Each will be dated and sourced when it arrives, and the figures above will be corrected in place.

Skin in the game disclosure. Victaura, through its parent Greystone B.V. (Netherlands), develops projects on Lake Como (Italy), in Nungwi, Zanzibar (Tanzania), on Gili Air and in Uluwatu, Bali (Indonesia), and holds an off-plan capital position on Al Marjan Island, Ras Al Khaimah (UAE). Readers should assume commentary may be influenced by, or benefit, these positions. This document is classified as marketing material under MiFID II Article 24(3). It is not investment advice.

References

  1. Marjan, Al Marjan Island masterplan page
  2. Marjan, Island overview
  3. Khaleej Times, Wynn Al Marjan Island pushes opening to September 2027, 5 August 2026
  4. AGBrief, Wynn confirms September 2027 UAE resort opening, raises budget by $600m, 5 August 2026
  5. Gulf News, Wynn Al Marjan Island tower tops out, December 2025
  6. Khaleej Times, Wynn Al Marjan Island to open in 2027, 3 May 2026
  7. Khaleej Times, Al Marjan Island with 12,000 residential units sold out, says CEO, 16 July 2024
  8. Khaleej Times, Marjan Beach to open first phase, 15 September 2026
  9. Zawya, Marjan and RAK Hospitality Holding announce landmark merger
  10. Trowers & Hamlins, Updates to real estate development laws in Ras Al Khaimah, 21 November 2023
  11. Ras Al Khaimah Municipality, Law No. 12 of 2023 (official copy)
  12. Ras Al Khaimah Municipality, Real Estate Regulatory Administration
  13. Al Tamimi & Company, Ras Al Khaimah's new real estate development law, 5 October 2026
  14. ADG Legal, RAK's New Real Estate Development Law: What Developers with Active Projects Should Review, 16 October 2026
  15. CBRE, RAK Real Estate Market Review H1 2026
  16. Consultancy-me, Ras Al Khaimah's real estate market sustains its long-term growth trajectory (CBRE H1 2026), 22 September 2026
  17. RLI, Marjan and RAK Hospitality announce merger, 23 October 2025
  18. Lexis Middle East, Ras Al Khaimah Law No. 10 of 2026 on the Regulation of Real Estate Development, 21 July 2026
  19. Al Jazeera, US, Iran hold mediated UNGA talks on ending war, opening Strait of Hormuz, 23 September 2026
  20. Al Tamimi & Company, Jurisdiction over real estate disputes returns to RAK courts, 10 September 2026

The images in this article are computer-generated illustrations, not photographs.

The information on this website is provided for informational purposes only and does not constitute an offer, solicitation, or financial advice. Indicated returns are estimates and are not guaranteed; past performance is not indicative of future results. Capital invested is at risk.

Considering an allocation to luxury real estate in the locations we operate? Speak to us about our current and upcoming projects.

Speak to Victaura →