Lake Como has steep slopes, a census of past landslides and three layers of rules that decide what may be built on them. ISPRA's IFFI inventory maps 10,439 landslide records in Como province, the Po basin plan classes active slides as Fa, and a Class 4 feasibility class excludes new building. This note shows how a principal reads those maps for a single parcel.

Victaura Research · · 17 min read

Illustration of a steep wooded slope above a lake with a scar of fresh earth from a small landslide, steel mesh pinned over the rock beside it and a stone retaining wall with drainage pipes belowIllustration

Key takeaways

  • - ISPRA's Lombardy inventory counted 130,540 landslide records over 3,307 km², 10,439 of them in Como province (measured, ISPRA, Rapporto sulle frane in Italia 2007).
  • - Rapid flows are about 41% of Lombardy landslide records, the most frequent type, and are typically triggered by intense rain in surface deposits (measured, ISPRA 2007).
  • - The PAI sorts landslide areas into Fa active, Fq quiescent and Fs stabilised; in Fa areas buildings may only be demolished without reconstruction, maintained in the ordinary way or made less vulnerable without added surface or volume (PAI implementing norms, article 9, text in force from 17 April 2025).
  • - Lombardy's Class 4 feasibility class excludes any new building, underground included, except works that make the site safe, and limits existing buildings to demolition without reconstruction, maintenance, restoration and conservative renovation without added surface, volume or settlement load (d.g.r. IX/2616 of 2011).
  • - Changes to PAI perimeters proposed through a municipal plan need a mandatory, binding regional opinion and take effect from the basin authority's approval decree, and the PAI classification must appear in the planning certificate (Regione Lombardia; d.g.r. 6314/2022; PAI article 18).
  • - Press reports document slides onto the SS340 Regina on 31 July 2019, 27 July 2021 (road closed two days, Il Giorno) and 7 June 2022 (about 80 mm of rain in a few hours, Il Giorno) (directional, press-reported).
  • - Nationally, P3 and P4 landslide hazard classes cover 9.5% of Italy and hold 1.28 million inhabitants, and Lombardy is among the six regions with the most people at risk (measured, ISPRA 2024 edition, not lake-specific).
  • - The Como count dates from 2007, the legal texts were read on official copies, one lake commune's norm was read and the note assesses no parcel (evidence limits, Victaura Research).
On this page (10)

How many landslides does IFFI map around Lake Como?

ISPRA's 2007 count put 10,439 IFFI landslide records in the province of Como, a provincial figure that covers more ground than the lake shore. IFFI (Inventario dei Fenomeni Franosi in Italia) is the national landslide register that ISPRA, the Italian environmental protection institute, keeps together with the regions. In its Lombardy chapter, ISPRA counted 130,540 landslide records covering 3,307 km², and 10,439 of them lie in the province of Como, where the mapped landslide area totals 216.34 km² (measured, ISPRA, 2007 report).

An inventory records where the ground has moved, and says nothing about when it will move again. The Lombardy census was built from aerial photo-interpretation, regional archives covering 1988 to 2005, earlier local inventories and field checks that tested the photo-interpretation on the ground. Each record carries a type of movement. None carries a probability. A principal who reads the count as a forecast has read the wrong column.

Como and Lecco, the provinces that hold the two southern branches of the lake, rank fourth and fifth in the regional table. Lecco carries 12,359 records over 191.82 km² and Como 10,439 over 216.34 km². Sondrio leads with 41,666, followed by Brescia with 31,012 and Bergamo with 26,583, while Varese records 2,510. The same table lists four deep-seated gravitational slope deformations for Como, against 49 for Sondrio (measured, ISPRA, 2007 report).

The report names the mechanisms, and rapid flows dominate. Across Lombardy, rapid flows make up about 41% of the landslide records, diffuse rockfall and topple areas about 32%, and rotational or translational slides about 16%. ISPRA describes rapid flows as widespread along streams and on slopes, and as typically triggered by intense rain in surface deposits (measured, ISPRA, 2007 report). On the lake, the 2021 storm described below brought four landslides onto the SS340 Regina in a single morning (directional, press-reported, AGI, 27 July 2021).

130,540
landslide records in the Lombardy IFFI inventory, covering 3,307 km² (measured, ISPRA, 2007 report; the inventory has been updated since)

Source: ISPRA, Rapporto sulle frane in Italia, chapter 7 Analisi del dissesto da frana in Lombardia 2007

10,439
landslide records in Como province over 216.34 km² of mapped landslide area (measured, ISPRA, 2007 report; no current provincial count was obtained)

Source: ISPRA, Rapporto sulle frane in Italia, chapter 7 Analisi del dissesto da frana in Lombardia 2007

41%
share of Lombardy landslide records that are rapid flows, the most frequent type (measured, ISPRA, 2007 report)

Source: ISPRA, Rapporto sulle frane in Italia, chapter 7 Analisi del dissesto da frana in Lombardia 2007

PAI landslide classes Fa, Fq and Fs

The PAI is the layer that carries legal limits, which an inventory does not. The Piano stralcio per l'Assetto Idrogeologico (PAI) is the basin plan of the Po river district basin authority. Under article 67 of D.Lgs. 152/2006, the basin authority adopts such plans to identify areas at hydrogeological risk, to perimeter the areas subject to safeguard measures and to set those measures. Lake Como drains through the Adda into the Po, so its slopes sit inside this planning system.

Landslide areas in the PAI fall into three classes. Article 9 of the PAI implementing norms, in the consolidated text the authority publishes as in force from 17 April 2025, marks Fa for active landslides with very high hazard, Fq for quiescent landslides with high hazard and Fs for stabilised landslides with medium or moderate hazard. Streams carry their own classes, with Ee, Eb and Em for areas that torrent phenomena can reach at very high, high and medium or moderate hazard, and alluvial fans carry Ca, Cp and Cn (PAI implementing norms, article 9).

Fa is close to a freeze on what already stands. Subject to article 3-ter of D.L. 279/2000, the text allows on buildings in Fa areas only demolition without reconstruction, ordinary maintenance and works that reduce the vulnerability of existing buildings without adding surface or volume, alongside slope remediation, water regulation and essential public networks that cannot be located elsewhere. Fq adds extraordinary maintenance, restoration and conservative renovation without added surface or volume, extensions for hygiene and functional upgrades, and extensions, renovation and new building where a municipal plan adapted to the PAI allows them. In Fs areas, regions and local authorities regulate permitted activities through their own planning tools, and any admissible work needs a compatibility study validated by the competent authority.

The perimeter on a parcel is a dated document, and the route to change it is public. Regione Lombardia states that the municipal geological component takes in basin planning and is also the tool through which municipalities propose changes to PAI and flood-plan perimeters, under a mandatory and binding regional opinion. Since d.g.r. 6314 of 2022, an approved change takes effect the day after the basin authority publishes the Secretary General's approval decree. A perimeter read today may differ from the one in force after the next decree.

An inventory records where the ground has moved. It does not say when it will move again.

Victaura Research

What does Class 4 forbid on a Lake Como parcel?

Class 4 excludes any new building, underground building included. The carta di fattibilità geologica is the map in a municipality's geological component that sorts land into four feasibility classes under the Lombardy criteria of d.g.r. IX/2616 of 30 November 2011. In the regional text, Class 4 is feasibility with serious limitations, and any new building, underground included, must be excluded except works that consolidate the ground or remediate it hydrogeologically to make the site safe.

Existing buildings keep a narrow list of works, and public works carry a burden of proof. An existing building in Class 4 may only be demolished without reconstruction, maintained in the ordinary or extraordinary way, restored or renovated conservatively, with no added surface, volume or settlement load, while seismic upgrades remain allowed. Public and public-interest infrastructure is allowed only where it cannot be located elsewhere, and the application must carry a geological and geotechnical report showing that the works are compatible with the serious risk. For inhabited settlements the criteria call for emergency plans and, where needed, geological monitoring.

Classes 1 to 3 form a ladder of studies. In the regional criteria, Class 1 carries no particular limitation and the national construction standards apply directly. Class 2 carries modest limitations that further investigation and construction measures can overcome without defence works. Class 3 carries substantial limitations that may call for specific works or defence works, and the geologist must define either the mitigation works or the further investigations that decide whether building can proceed (d.g.r. IX/2616 of 2011).

Lake communes add letters that name the process. The regional criteria allow each class to be split into sub-classes and require the split where a sub-class marks land under particular rules, such as PAI landslide areas under article 9 or river bands. In the geological norms of Bellagio, a lake commune, sub-class 3a covers quiescent Fq landslide areas studied in detail, where the Class 3 rules apply to every type of work with no exception. Sub-class 3b and Class 4a mark old underground mine workings rated at high risk. In that text, the rule attaches to the letter.

The wording that binds is the commune's own. Bellagio's Class 4 article quotes an earlier regional wording without the underground clause, and adds that new buildings meant for the continuous presence of people must be prevented. It gives existing buildings placed in Class 4 without being properly mapped a route to reuse or change of use, through a geological study of a significant surrounding area and a reclassification by planning variant. In Bellagio's Class 3, any new building proposal needs a geological, hydrogeological and geotechnical assessment, while maintenance and restoration are exempt outside sub-class 3a.

PGT feasibility map and PAI perimeters, side by side

Two maps speak to the same parcel, and different authorities draft them. The PAI perimeters come from the basin authority. The feasibility classes come from the municipality's geological component, which also holds a PAI and flood-plan map. The regional criteria tie the two with a correlation table, in which an Fa active landslide corresponds to Class 4, an Fq quiescent landslide to Class 4 or 3 and an Fs stabilised landslide to Class 2 or 3, while an Ee torrent area corresponds to Class 4.

Where the two readings differ, the stricter one is the working assumption. The regional criteria give active and quiescent landslide areas an entry Class 4, and where several phenomena overlap on one area, the highest class applies. Some Class 4 entries are marked with an asterisk, such as debris flows on alluvial fans, and those cannot be lowered by the geologist. The commune's technical office is the body to confirm in writing which rule applies to a given parcel, and that written answer belongs in the file before any price is agreed.

The regional rulebook has been amended repeatedly. Regione Lombardia's page lists the acts that frame the component, from DGR 40996 of 1999 on map legends and the four feasibility classes and DGR 2616 of 2011 on the criteria, to DGR 6738 of 2017 and DGR 470 of 2018 on the flood-risk plan, DGR 6314 of 2022 on approving municipal proposals to update basin plans, DGR 7564 of 2022 on sinkholes and DGR 3007 of 2024 on reference studies and data. None of the later acts rewrites the Class 4 paragraph of DGR 2616.

A component drafted before those acts may rest on an older frame. Municipal studies carry the year of their drafting, and the principal should read that date first. The Bellagio norms date from 2012, were drafted for the commune before its merger with Civenna and cite the 2008 national construction standards, which shows how a file ages. The point concerns the date on the file, and no judgement on any commune is intended.

LayerIssued byWhat it showsWhat it limitsEvidence grade and source
IFFI landslide inventoryISPRA with Regione LombardiaMapped landslide records and type of movementNothing directly, it is the evidence baseMeasured, ISPRA 2007 report (Como 10,439 records)
PAI landslide classes Fa, Fq, FsPo basin authorityActive, quiescent and stabilised landslide areasFa allows on buildings only demolition without reconstruction, ordinary maintenance and vulnerability-reduction works without added surface or volume; Fq adds extraordinary maintenance, restoration and conservative renovation, extensions for hygiene and functional upgrades, and new building where a plan adapted to the PAI allows itNot graded, article 9 of the PAI implementing norms, consolidated text in force from 17 April 2025
PAI torrent classes Ee, EbPo basin authorityAreas torrent phenomena can reach, very high and high hazardEe allows on buildings only demolition without reconstruction, ordinary and extraordinary maintenance, restoration, conservative renovation and vulnerability-reduction works; Eb adds renovation without added surface or volume and extensions for hygiene and functional upgradesNot graded, article 9 of the PAI implementing norms, consolidated text in force from 17 April 2025
Feasibility map, classes 1 to 4Commune, under DGR 9/2616 of 2011Four classes of geological limitationClass 4 excludes new building, underground included, and limits existing buildings to demolition without reconstruction, maintenance, restoration and conservative renovation without added surface, volume or settlement load; Class 3 makes use subject to further studiesNot graded, d.g.r. IX/2616 of 2011 and the Bellagio geological norms of 2012
Parcel geological studyGeologist engaged by the applicantGeological, geotechnical and seismic model of the parcelA signed technical check for every work allowed in a PAI landslide or torrent area; a geological assessment for new building in Bellagio's Class 3Not graded, article 9 of the PAI implementing norms and one lake commune's norm
The five layers a principal meets when reading a Lake Como slope

Reading the Lake Como maps for one parcel, step by step

Step one is the parcel, and the village comes second. The principal needs the cadastral sheet and parcel number, and the commune, because the geological component is drafted municipality by municipality and the class attaches to mapped land. A listing that says the property sits above the lake tells the reader nothing about class, perimeter or record.

Step two is the municipal geological component. It should hold the feasibility map, the technical norms attached to it and a PAI and flood-plan map. The principal reads the class, the letter and the norm text for the parcel and for its surroundings, because the Bellagio Class 3 norm asks for knowledge of the local geological model and of its surroundings before any use. A neighbour in a stricter class can matter.

Step three is the IFFI layer on IdroGEO. IdroGEO is ISPRA's open-data platform, with maps and downloads for the IFFI inventory, the national hazard mosaics and the risk indicators. ISPRA also runs a function that lets local administrations and professionals report new landslides, and ISPRA says the function updates the inventory it manages with the region. A recent slide near a parcel may therefore show there before it shows in a municipal map.

Step four is a geologist's reading and a written answer from the commune. Article 9 of the PAI norms makes every work allowed in a mapped landslide or torrent area subject to a technical check of its compatibility with the instability, signed by a qualified professional and attached to the project, and that check is the principal's most useful document on the parcel. A second document is the certificato di destinazione urbanistica, the planning certificate provided for by law, in which article 18 of the PAI norms requires the commune to enter the PAI classification of the land. Under the same article, the party carrying out the works signs a release that excludes public liability for future damage from the flagged instability. The same sequence applies to any parcel on the lake.

Documented Lake Como landslide events, 2019 to 2022

The western shore has a documented pattern of rain-triggered slides onto its single coastal road. Three press-reported episodes show it. On 31 July 2019, a violent storm brought debris and rock onto the SS340 Regina in the central-lake villages, a landslide closed the provincial road at Sant'Anna in Argegno, and traffic ran one-way alternating between Laglio and Brienno and between Argegno and Colonno (directional, press-reported, Espansione TV, 31 July 2019).

The storm of 27 July 2021 was the largest of the three. Il Giorno reported the Regina closed for two days, debris piles up to three metres high and more than sixty fire brigade interventions on the morning of 27 July (directional, press-reported, Il Giorno, 28 July 2021). Varesenews reported 50 residents isolated at Brienno by landslides and flooding on the SS340. Espansione TV reported a collapsed bridge at Cavadino and part of the Laglio lakefront collapsed, and AGI counted four landslides on the Regina in one morning.

The storm of 7 June 2022 hit the same road. Il Giorno reported about 80 mm of rain in a few hours overnight, landslides and mudflows at Laglio and Nesso, both the Regina Nuova and the Regina Vecchia covered, and several families out of their homes. The mayor of Laglio said that works funded by Regione Lombardia would have gone to tender in early September, and that emergencies move faster than interventions (directional, press-reported, Il Giorno, 7 June 2022).

Press accounts agree on places and differ on detail. The stream that flooded Laglio in July 2021 appears as Caradello in two reports and as Torriggia in a third. Closure lengths, counts of interventions and numbers of isolated residents come from different bulletins issued at different hours. A principal should use these reports to date the pattern, and should obtain the municipal and regional event records for any figure that enters a model.

The events are shallow flows and debris on streams, which fits the dominant type in the inventory. That fit is an observation, and none of the sources read published a causal analysis. It also shows where the reported damage fell in these three episodes, mostly on roads, bridges and lakefront, the access side of a property, although in June 2022 several families also had to leave their homes.

Two maps speak to one parcel. Where they differ, the stricter reading is the working assumption until the commune confirms in writing.

Victaura Research

What the national ISPRA picture adds for Lake Como

ISPRA's 2024 report puts the national landslide inventory above 636,000 records. The IFFI covers the period from 1116 to 2024, and 28% of the landslides are extremely rapid phenomena with high destructiveness (measured, ISPRA, Rapporto dissesto 2024, executive summary). The 2024 national mosaic of PAI landslide hazard puts about 69,500 km², 23% of the territory, in hazard and attention areas.

The highest hazard classes carry restrictive land-use limits. The high and very high hazard classes of that mosaic, P3 and P4, cover 9.5% of national territory, and ISPRA counts 1.28 million inhabitants in them, 2.2% of the population. It lists Lombardy among the six regions with the highest population at risk from landslides and floods (measured, ISPRA, 2024 edition). These figures are national and regional, and none is specific to the lake.

ISPRA links intensifying rain to more shallow slides and fast debris flows. Its executive summary says concentrated heavy rain is increasing shallow landslides, rapid mud and debris flows and flash floods, with effects on territories less exposed in the past, and notes that 2024 was the warmest year in Italy (directional, ISPRA, 2024 edition). For the lake, that reading argues against treating past frequency as a settled guide.

This note covers slopes, and the lake's own water is a separate subject. Lake-level floods and the engineering response to them are in Designing for the Hazard, Not Just Insuring It. The two hazards can share a storm, and they sit on different maps with different rules.

9.5%
of Italian territory in the highest landslide hazard classes P3 and P4, which carry restrictive land-use limits (measured, ISPRA 2024 edition, national figure and not lake-specific)

Source: ISPRA, Rapporto dissesto idrogeologico in Italia, executive summary edizione 2024 (415/2025) 2025

What a hazard class changes for an existing Lake Como villa

A class changes what can be done to a building that already stands. Under article 9 of the PAI norms, a building in an Fa area may only be demolished without reconstruction, maintained in the ordinary way or made less vulnerable without adding surface or volume, and Fq adds the wider list set out above, with new building only where a plan adapted to the PAI allows it. In a Class 4 area, the regional criteria stop at demolition without reconstruction, maintenance, restoration and conservative renovation with no added surface, volume or settlement load. Extension and reconstruction rights, which an acquisition model may assume, depend on the class and perimeter in force on the day of the application.

An underwriting case that assumes extra volume should test it against the class first. If the model adds a floor, a pool house or a rebuild, the class and the letter on the parcel decide whether the application can be lodged at all. That check costs a records search and a geologist's opinion, and it sits ahead of any design fee.

Class 3 leaves the outcome to the study. Because use is subordinate to further studies, which in the Bellagio text set the exact volumes and locations, the suitable uses and any defence works, two Class 3 parcels can end with different permitted envelopes. The study, rather than the colour on the map, sets the envelope.

The cost side belongs to a different note. For how construction cost per square metre is built up on the lake, see Building on Lake Como: What a Square Metre Costs. This note prices none of the studies or works, because the sources read for it give no figures for them.

Where the Lake Como landslide evidence is thin

This note uses four evidence grades. A measured figure is counted or recorded by the source, as with registry data, official statistics or audited results. An industry estimate is produced by a research firm or an industry body with a stated method. A broker-reported figure is published by an agency or a developer about its own market. A directional figure is a signal whose direction is reliable but whose size is not. No figure here is an industry estimate or broker-reported.

The Como count is from 2007. The 10,439 figure comes from ISPRA's 2007 Lombardy chapter, built on a census that ran from March 2001 to December 2004, with updates in 2005 and 2006. The inventory has been updated since, and no current provincial count was obtained from IdroGEO. The figure marks the scale of the record and should not be quoted as today's total.

The legal texts were read on official copies, and the commune text is one commune's. The PAI norms were read in the consolidated text in force from 17 April 2025, published by the Po river district basin authority, and the class wording in d.g.r. IX/2616 of 2011 as hosted by Regione Lombardia and in Bellagio's 2012 geological norms. Other lake communes may differ in letters and detail, and no parcel's class was read from a municipal map.

The events rest on press reports. The three episodes come from local news, which differ on stream names and counts, and no official event record was obtained for any of them. They are graded directional, press-reported.

An inventory is not a hazard map, and a hazard map is not a survey. Unmapped slopes exist, perimeters lag new movement and no map says when. This note assesses no parcel, and nothing in it states whether any particular site is or is not exposed.

Class 4 excludes new building. Everything else on the lake starts with the study.

Victaura Research

Can a principal use these maps without a geologist?

The maps frame the question, and a geologist answers it for the parcel. An inventory, a basin perimeter and a feasibility class each say something different, and none replaces a signed study of the ground. The PAI norms make a signed technical check a condition of every work allowed in a mapped landslide area, and the Bellagio norms ask for a geological assessment before any new building in Class 3, so the principal meets the geologist sooner or later.

Five questions come before any price. Which class and letter does the municipal map give the parcel? Does a PAI perimeter touch it, and of which type? Does IFFI hold a record on it or beside it? What do the commune's technical norms allow for the existing building? What does a dated, signed geological opinion say?

The sequence protects the downside before it prices the upside. Underwriting a lake asset starts with what the land permits. On a slope with a documented record, a PAI perimeter or a Class 4 label, those written limits decide what the asset can become, and the price has to start from them.

Skin in the game disclosure. Victaura, through its parent Greystone B.V. (Netherlands), develops projects on Lake Como (Italy), in Nungwi, Zanzibar (Tanzania), on Gili Air and in Uluwatu, Bali (Indonesia), and holds an off-plan capital position on Al Marjan Island, Ras Al Khaimah (UAE). Readers should assume commentary may be influenced by, or benefit, these positions. This document is classified as marketing material under MiFID II Article 24(3). It is not investment advice.

The images in this article are computer-generated illustrations, not photographs.

The information on this website is provided for informational purposes only and does not constitute an offer, solicitation, or financial advice. Indicated returns are estimates and are not guaranteed; past performance is not indicative of future results. Capital invested is at risk.

Considering an allocation to luxury real estate in the locations we operate? Speak to us about our current and upcoming projects.

Speak to Victaura →